KRITIS compliance
Your KRITIS compliance obligations are not optional paperwork.
First result within 24 hours.
If you operate or supply critical infrastructure in Germany, you need security measures, evidence and processes that can stand next to KRITIS expectations and BSI IT-Grundschutz, not a generic policy pack.
Recognize your situation?
- Scope is still an argument, not a working picture
- Grundschutz-style measures were started and then left as catalogues
- Incident reporting or audit evidence would be assembled in a panic
One free session per client: the first 4 hours with a specialist, plus unlimited AI as a tool.
The problem
What KRITIS compliance looks like, how you can tell, and what is at stake if it stays.
Signs your KRITIS obligations are not optional paperwork
These are concrete signals that the duty and the estate have drifted apart.
Scope is still an argument, not a working picture
Which installations, networks, and services are in, and which are not, would be hard to defend.
Grundschutz-style measures were started and then left as catalogues
Building blocks exist on paper and not in the plant, the network, or the team.
Incident reporting or audit evidence would be assembled in a panic
The path is not ready for a clock.
OT, IT and documentation describe three different organisations
The drawings do not match the cables.
A supervisory, customer, or insurance request already exposed the thin spots
The unease after that request was accurate.
What KRITIS compliance looks like
What unmet KRITIS and BSI IT-Grundschutz obligations look like, how it feels when documentation does not match the plant or the network, and why a control that exists only in a spreadsheet does not protect a hospital, a utility, or a supply chain.
A KRITIS gap is an obligation, not a slogan: unclear scope, IT-Grundschutz-style building blocks never really implemented, and incident reporting or audit evidence that would not be ready under time pressure for operators or suppliers of critical infrastructure in Germany.
Operators often inherited a mix of old networks, new cloud, and incomplete evidence. The gap is serious, and it is also something a specialist can make tractable. We do not sell an official BSI certificate, and a session is not a supervisory audit.
Scope, measures and evidence are not ready under pressure
Scope is unclear, Grundschutz-style building blocks were never really implemented, and incident reporting or audit evidence would not be ready under time pressure.
Documentation does not match the estate you have
You are responsible for something society actually depends on, and the documentation does not match the plant, the network, or the team you have.
Critical infrastructure security is a duty of care
Critical infrastructure security is a duty of care. A control that exists only in a spreadsheet does not protect a hospital, a utility, or a supply chain.
If you leave it, and if we close the urgent gaps
If you leave it
If the obligations stay unmet, you can fail an audit, miss a reporting duty, or discover during an incident that a required measure was never actually in place.
If we close it
You get a plain map of the KRITIS-shaped gaps that apply in your setup, and the first practical fixes that fit the session.
Recognize your situation?Message us, we will sort it out.
Why it happens
Where this usually comes from, why it shows up in fast or AI-assisted work, and how to check it yourself.
Why KRITIS and Grundschutz work stalls
The duty is heavy, and the estate was rarely designed for it from day one.
- 01
The obligation was treated as a documentation project
Catalogues grew. Measures in the estate did not.
- 02
OT and IT never shared a single scope picture
Each believed the other owned the hard parts.
- 03
A previous audit was survived, then the programme froze
Survival was mistaken for a living system.
- 04
Cloud and new connections arrived without re-scoping
The duty still has to see the new paths.
- 05
Evidence lived with one person who has since changed role
A private folder is not an obligation met.
Why KRITIS and IT-Grundschutz gaps are being felt now
Obligations did not get lighter, and estates got more mixed: old plants, new cloud, smaller teams. Assistants can draft catalogues and still leave a reporting path untested. The honest work is a human map of scope, measures and evidence as they really are, then the first fixes that change the estate, not only the binder.
How to start a KRITIS gap picture yourself
These checks do not replace a specialist, but they make the first conversation sharper.
Write a working scope paragraph, including doubts
Honesty about uncertainty is more useful than a false tidy list.
Pick three measures and ask to be shown them in the estate
If the only answer is a catalogue entry, they are not implemented.
See whether a reporting or audit path would work this week
Names, evidence, and a clock.
Put OT and IT on the same sketch
The missing bridge is often the finding.
Gather the last official or customer request you found hard
Those questions are a preview.
0/ 5
Recognize your situation?Message us, we will sort it out.
How Contentum fixes it
A senior specialist leads. AI is a tool. A human checks the result.
Operators often inherited a mix of old networks, new cloud, and incomplete evidence. The gap is serious, and it is also something a specialist can make tractable.
Contentum is Human First. A specialist leads KRITIS and IT-Grundschutz gap work. AI may help us organise catalogues and evidence. A human writes what is real. We do not sell an official BSI certificate, and a session is not a supervisory audit.
You need a plain picture of scope, measures and evidence as they really are, then the first practical fixes that fit the session. A full KRITIS programme is a complex project; we will say so.
How a typical weekday case moves
- 01Message received
- 02Specialist named
- 03Diagnosis
- 04Fix
- 05Human check
- 06Handover
How to get a human onto a KRITIS gap
No web form, no web chat. We do not sell an official BSI certificate, and a session is not a supervisory audit.
Write about the duty and the thin spots
Write on WhatsApp or Telegram. Say what you operate or supply, who is asking, and whether scope, measures or evidence already worry you.
You get a specialist's name
Within a minute you should see the name of the person who will lead. That specialist is alerted, and can be called if they do not respond.
A weekday case in scope is the 24-hour aim
A plain gap map and first practical fixes is the aim on a typical weekday. A full KRITIS programme is a complex project, and we will say so.
How a Contentum specialist works a KRITIS gap
We start with scope, measures and evidence as they really are, then close what we can in agreed scope.
We start with scope, measures and evidence as they really are, then close what we can in agreed scope. A full KRITIS programme is a complex project; the 24-hour aim is a typical weekday case.
- 01
Form a working scope picture, including uncertainty
A false tidy list helps nobody.
- 02
Map measures and evidence against the estate, including OT and IT
The mismatches are the work.
- 03
Close a first practical gap the session can reach
A missing owner, a reporting path, a measure that can actually be shown.
- 04
Align the drawings with the cables
A shared sketch is already a control improvement.
- 05
Leave the official programme and any audit path as a named project
We will not pretend a session is a supervisory audit.
What to send so the first session is sharp
You do not need a finished catalogue. Honest fragments help.
What you operate or supply, in one paragraph
And whether you already consider yourself in scope.
Any existing Grundschutz, audit, or consultant material
Even a partial catalogue.
Who is asking
Supervisor, customer, insurer, or internal.
Constraints around plants, care, or safety
Name them first.
Any deadline you have been given
Do not invent one if none exists.
Quick and urgent fixes
First 4 hours with a specialist + unlimited AI: free, once per client. Further work is paid, on request. A human leads and checks the result.
Free (first session)
Complex projects
Larger work uses a different rate, on request. We say so before we continue.
On request
Weekdays, then weekends
The base plan is weekdays only. Weekend work is a separate product. Any surcharge is stated up front, before any call, and depends on complexity. Amount: on request.
On request
The first session is free: the first 4 hours with a specialist, plus unlimited AI, once per client. Work beyond that, the complex-project rate, and the weekend rate are paid, on request.
One free session per client: the first 4 hours with a specialist, plus unlimited AI as a tool.
Stay fixed
What not to do next, the stacks we see in this kind of work, and how to keep the fix in place.
Mistakes that leave KRITIS work as a binder
These are common when the duty is treated as documentation.
Updating catalogues and not the estate
A building block on paper is not a measure.
Leaving OT out of the picture because it is awkward
Awkward is often exactly where the obligation sits.
Claiming readiness you cannot show
A later audit or incident will make that sentence expensive.
Waiting for a perfect official project before fixing an obvious gap
A reporting path can start now.
Asking us to issue a BSI certificate
We will not. We will tell you what official routes involve.
How to keep KRITIS work alive after the first map
A gap analysis that does not change operations will rot.
Keep a living scope picture with an owner
The estate will change.
Show measures in the estate, not only in a catalogue
Reviews should look at both.
Exercise reporting with a dry run
The first real clock is a poor rehearsal.
Keep OT and IT in the same conversation
Separate programmes hide the bridge.
Put evidence where more than one person can find it
A private folder is not resilience.
Budget the official programme honestly
The first session is a start, not the end of the obligation.
Where KRITIS-shaped gaps usually land
The duty is organisational. The holes still sit in systems you can name.
OT, plants and safety-adjacent networks
Often under-documented and over-trusted.
IT, identity and remote access into those networks
The bridge.
Incident reporting and evidence stores
A clock you cannot yet meet.
Suppliers and maintenance connections
Vendor paths into critical systems.
Cloud or new services added without re-scoping
New, and still in the duty.
Recognize your situation?Message us, we will sort it out.
Questions about KRITIS compliance
Straight answers about this problem, the session, and what happens next.
Do you issue a BSI or KRITIS certificate?
No. We help you see and close practical gaps. We do not sell an official BSI certificate, and a session is not a supervisory audit.
We are a supplier, not the operator. Is this still relevant?
It can be, if you supply or connect into critical infrastructure. Tell us how you sit in the chain. We will not invent a scope.
Is this the same as NIS2?
No. They can overlap in organisations and in measures. They are not the same duty. See also our NIS2 page.
Will you invent a legal opinion?
No. We may say you should involve counsel. We will not pretend a session is legal advice.
What do I get within 24 hours?
A first result: a gap assessment and a plan you can act on, on a typical weekday in agreed scope. A finished programme — a full SOC, a certificate, or a rebuilt estate — is later work, and we will say so. The first 4 hours with a specialist, plus unlimited AI as a tool, are free, once per client.
Do I fill in a form?
No. There is no web form and no web chat. Write on WhatsApp or Telegram. Within a minute you should see the specialist's name.
Will you publish findings?
No. This is a private service conversation, not a public write-up.
What is free?
You get one free session per client: the first 4 hours with a specialist, plus unlimited AI as a tool. Further work is paid, on request.
Do you take emergency work during an active attack?
Yes. If you are under an active attack, write now on WhatsApp or Telegram and say so in the first message. A specialist is alerted, and can be called. Keep your own incident plan running in parallel — two paths are safer than waiting. We start as soon as we can on a typical weekday case in scope. We do not promise to stop every attack in a day, but we do take this work.
What is free, and what does “within 24 hours” mean?
You get one free session per client: the first 4 hours with a specialist, plus unlimited AI as a tool. On a typical weekday, for a case in agreed scope, we aim to give you a first result within 24 hours: a gap assessment and a plan. On urgent, in-scope fixes we often close the job itself in that window. That 24-hour line is a speed aim, not 24 hours of unpaid work, and not a promise to finish a large programme in a day.
Related security problems we also take on.
See all 20 problems. Each page is written for one pain, not as a copy of this one.
Need urgent help, fast?
If you have a deadline or an incident in motion, these Help Hub topics are a closer match.
Your KRITIS compliance obligations are not optional paperwork. First result within 24 hours.
Write on WhatsApp or Telegram. You will talk to a person. We aim to give you a first result within 24 hours — a gap assessment and a plan — a map and first measures, not an official certificate in a day.
One free session per client: the first 4 hours with a specialist, plus unlimited AI as a tool.